The mechanicals have been inspected on 1st and 2nd floor. We are scheduled to start insulating on Tuesday, December 27th.
![]() |
| Wires have been landed in the electrical panels. |
![]() |
| Home automation, video matrix, speaker wires, security, Ethernet and phone wires have been run. |
![]() |
| Kohler DTV electronic shower control unit has been installed. |
![]() |
| The new master tub has been installed along with the spout and water control. |