The fire place has been installed.
HVAC has started - connecting bath fan venting.
Cold air returns are beings installed.
The laundry chute has partially been installed.
The tray has been finished in the master bedroom.
The central vac ports have been installed, wire and drilled for piping.
Comments
Post a Comment